In The Works

7T
7T

press to zoom
7T - 1
7T - 1

press to zoom
7T - 4
7T - 4

press to zoom
7T
7T

press to zoom
1/6

 

Radiology 7T MRI

Carle Hospital, Urbana, Illinois

 

GHR performed mechanical, electrical, plumbing, fire protection and coordination modeling and full construction administrative services for this state-of-the-art 7-Tesela MRI installation project at Carle Foundation Hospital.  Coordination was especially challenging as this very large piece of equipment was to be located in an existing basement space with very limited head space.  Through careful and thorough coordination modeling efforts between GHR, the construction manager and the sub-contractors, this effort went smoothly.

Central - 1.1
Central - 1.1

press to zoom
Central - 1.2
Central - 1.2

press to zoom
Central - 3
Central - 3

press to zoom
Central - 1.1
Central - 1.1

press to zoom
1/5

 

Champaign Central High School Additions & Remodel

Champaign, Illinois

 

This $87.1 million referendum funded project provides a complete renovation of the existing 1934 school building with a new 3 story classroom addition which includes a new theater, auto shop,  kitchen and cafeteria.  A three court gym, locker room weight room addition will be added on to other side of the building.  New HVAC systems will be added to provide the school with much needed air conditioning.  New LED lighting, and technology will be added to bring the existing building up to current standards of today. GHR is providing complete MEP-FP design on this project.

Swann Facility
Swann Facility

press to zoom
Swann Facility
Swann Facility

press to zoom
1/1

 

Swann Special Care Center

Champaign, Illinois

 

This new addition to the existing special care facility provides its residents with a new classroom wing, and lounge area.  GHR is providing the MEP design with new LED lighting, and HVAC systems.

IPA
IPA

press to zoom
IPA
IPA

press to zoom
1/1

 

Champaign International Prep Academy

Champaign, Illinois

 

This $8 million project provides a new 2 story school for Kindergarten thru fifth grade. GHR Provided complete MEP-FP and Technology consulting design services on this new K-5 school.

Hanley Building
Hanley Building

press to zoom
Open office space
Open office space

press to zoom
Conference Room
Conference Room

press to zoom
Hanley Building
Hanley Building

press to zoom
1/5

 

Harry R. Hanley Building

Springfield, Illinois

 

GHR provided MEP-FP design and construction administration services for various improvements at the Hanley Administration Building.  One part of this project includes upgrading IDOT’s antiquated auditorium into a modern-day conference center.  GHR has been tasked with providing all required electrical infrastructure for the new AV systems; designing a flexible power system; developing an energy efficient and flexible lighting system to facilitate the space programming; re-designing the HVAC serving this space to eliminates noise and thermal comfort issues; and coming up with creative solutions to the current space’s plumbing issues.  In addition, GHR is also designing a variable refrigerant flow heating and air conditioning system to replace the buildings defunct perimeter heating/cooling system.  The lack of this existing system has caused the building’s VAV systems to work in overdrive and is causing premature failure of existing systems. Lastly, GHR is working with Baily Edward to upgrade the building’s 50 year old toilet facilities: this include all new fire alarm devices, lighting, plumbing to new plumbing fixtures and re-distribution of the existing ventilation and exhaust.

Maroa-Forsyth
Maroa-Forsyth

press to zoom
Maroa-Forsyth
Maroa-Forsyth

press to zoom
1/1

 

Maroa-Forsyth Junior High School Addition

Maroa, Illinois

 

This $30 million project provides the Middle School addition to the existing High School brought a richer experience with enhanced shared amenities to all students, while maintaining a clear identity for both student groups.  Shared spaces include an expanded technology-rich media center, new fine arts learning environments for band, choir and art, and an auditorium. To maximize district resources, the building also shares kitchen and food service facilities as well as top-notch athletic amenities.  Flexible spaces, collaboration areas, and hand-on labs provide a variety of future-focused learning environments designed to encourage social, emotional, and intellectual growth of middle school students.