top of page

Education K-12

 

Paris Cooperative High School

Paris, Illinois

The two school districts of Paris Unit School District No. 95 and Paris Community Unit School District 4 needed to replace their 100-year-old cooperative high school in Paris, Illinois, with a new high school that provides 21st Century Learning Environments. The 134,600 sq. ft. high school is designed for an initial enrollment of 600 with the ability to expand to 900 in the future.  The design features STEM Labs, extended learning areas for collaboration, a 500 seat performing arts center auditorium that will be shared with the community, a three-court gymnasium that includes a competition court with bleachers for over 2000 spectators, and modern on-campus dining and food service accommodations. The high school site design includes parking for 500 cars and new athletic field components including football stadium, practice field, track & field event components, baseball field, softball field, and tennis courts.  In addition to creating a 21st Century learning environments, both districts were committed to designing a building that is friendly to the environment. The new high school is designed to achieve LEED Silver certification by utilizing an energy efficient geothermal mechanical system, water efficient plumbing systems, recycled and regional building materials, construction waste management, and enhanced indoor environmental quality features.  GHR provided complete MEP-FP design services for this project in addition to construction administration.

 

Meridian High School Additions & Remodel

Macon, Illinois

 

In an effort to reduce Meridian School District’s current four campus district to a two campus district, the existing football and baseball venues were relocated, a multi-story high school addition was built to replace the existing high school, and the existing high school facility was fully renovated to house the middle school students.  Shared amenities for both middle and high school students were created in a transitional zone that houses food service, arts programs, career education, and athletics.  GHR provided complete MEP-FP design services and construction administration for this project.

 

Garden Hills Elementary School Additions

& Remodel

Champaign, Illinois

 

This phased $12,000,000 project involved construction of an addition to an existing school while classes were in session.  The addition was awarded LEED Silver.  It features all the things a K-12 District wants in a building.

-Water Conserving fixtures

-Geothermal heating and cooling

-Energy Recovery

-Demand controlled ventilation

-Architecturally-pleasing lighting schemes that comply with latest energy code.

 

 

 

Geneseo High School Remodel & Addition

Geneseo, Illinois

 

This refferendum funded project provides a state-of-the-art concert hall addition, a performing arts theater remodel, upgrades to the school's library (information commons area), adds updated art rooms, 3D creation spaces, and rennovated administration areas.  In addition, the school's football facilities will be completely fit up with new playing surface new lighting, and a new entry/concession stand/ticket booth.  GHR is providing complete MEP-FP design on this project.

 

Roanoke-Benson CUSD #60

Roanoke, Illinois

 

This new 27,000 sq. ft. addition connects the existing high school and elementary school while providing a secure main entry to the facility.  Direct access to shared spaces such as the gym, music room and kitchen for both the High School and the Sowers Elementary School students is now provided. A new centralized administration area provides controlled access of visitors to the site and a new centrally located library gives flexibility to the facility. In addition, this project includes modernized science labs and classrooms as well as a renovated wood shop and band room.  GHR provided complete MEP-FP design services and construction administration for this project.

 

Cunningham's Children's Home

Education and Recreation Center

Urbana, Illinois

 

The new Education and Recreation Center (ERC) is planned as part of the Phase II expansion of the Cunningham Children’s Home campus. The ERC facility will combine both the residential school program (Gerber School) and day school program (Circle Academy) in a single facility and will also include new dining and recreation facilities to support the entire campus. GHR provided the mechanical, electrical, plumbing and fire protection design components.

New K-8 School

Waltham CCSD #185

Utica, Illinois

 

GHR Provided complete MEP-FP and Technology consulting design services on this new K-8 school.

John's Hill 1.png

John's Hill Magnet School

Decatur, Illinois

 

The Johns Hill Magnet School project was a $30 million new building that would ensure student-focused learning environments and that would expand learning beyond traditional expectations to further engage students. The K8 school focused on arts integration and English-Language learning curricula. Johns Hill Magnet School featured a 750-seat auditorium, as well as a 672-seat gym. Students could enjoy an Art Alley, Learning Stair and STEAM Suite for grades 6-8.  GHR provided mechanical, electrical, plumbing and fire protection design services for this unique project.  Additionally, GHR provided energy-code required commissioning services.

 

Champaign Central High School Additions & Remodel

Champaign, Illinois

 

This $87.1 million referendum funded project provides a complete renovation of the existing 1934 school building with a new 3 story classroom addition which includes a new theater, auto shop,  kitchen and cafeteria.  A three court gym, locker room weight room addition will be added on to other side of the building.  New HVAC systems will be added to provide the school with much needed air conditioning.  New LED lighting, and technology will be added to bring the existing building up to current standards of today. GHR is providing complete MEP-FP design on this project.

 

Champaign International Prep Academy

Champaign, Illinois

 

This $8 million project provides a new 2 story school for Kindergarten thru fifth grade. GHR Provided complete MEP-FP and Technology consulting design services on this new K-5 school.

 

Maroa-Forsyth Junior High School Addition

Maroa, Illinois

 

This $30 million project provides the Middle School addition to the existing High School brought a richer experience with enhanced shared amenities to all students, while maintaining a clear identity for both student groups.  Shared spaces include an expanded technology-rich media center, new fine arts learning environments for band, choir and art, and an auditorium. To maximize district resources, the building also shares kitchen and food service facilities as well as top-notch athletic amenities.  Flexible spaces, collaboration areas, and hand-on labs provide a variety of future-focused learning environments designed to encourage social, emotional, and intellectual growth of middle school students.

St. Joseph-Ogden High School Theater & Weight Lifting Addition

St. Joseph, Illinois

 

The St. Joseph-Ogden High School turned its existing gym into a state of the art theater with new lighting, sound system, and balcony.  This project also added a new weight room to the west side of the building.  GHR provide new sprinklers for the entire building, new lighting for the original high school building and geothermal for heating and cooling the building.  This $6.5 million project is completed for the 2023-24 school year.

bottom of page